Fabrica House
Architectural CGI of Fabrica House exterior at Blanchardstown Corporate Park
UNDER CONSTRUCTION · Q2 2027

A new perspective
on industrial space.

Fabrica House. Blanchardstown Corporate Park.

Discover the opportunity ↗
LIGHT INDUSTRIAL / WHOLESALE / TRADE / MANUFACTURINGScroll to explore ↓
Computer generated image
01 / THE OPPORTUNITY

Space to work.
Room to grow.

A prominent new home for your business, in one of Dublin’s established business locations.

Fabrica House brings together flexible warehouse space and light-filled offices on a self-contained 0.9-acre site. Designed for light industrial, wholesale, trade and manufacturing uses, it combines practical performance with a distinctive architectural presence.

Download the brochure ↓
14,677sq ft

1,363.5 sq m total floor area

Gross External Area
8.65m

Approx. clear internal height

Q22027

Ready for occupation

CGI showing the proposed warehouse interior and loading doorsDesigned for the way you work · CGI
02 / BUILT TO PERFORM

Considered design.
Every square metre.

From the loading doors to the office floor, a specification designed to support your day-to-day operations.

Level access doors
2
Warehouse floor loading
40 kN/m²
Power provision
100 kVA
Yard depth to gate
38 m
Total car parking spaces
15
EV car parking spaces
4
Bicycle spaces
22
03 / ACCOMMODATION

A place for
every part of your business.

Download floor plans ↓
Architect's ground, first and second floor plans for Fabrica HouseView full architectural plans ↗
AccommodationArea (sq.m)
Ground floor warehouse963.3
Ground floor office*149.6
First floor office*167.8
Second floor plant*82.8
Total1,363.5

Gross external areas. *Includes associated lobby, toilets, tea station and stairs as detailed in the plans. Areas are approximate and subject to verification.

04 / A MORE CONSIDERED WORKPLACE

Built for business.
Designed for tomorrow.

High-performance glazing brings natural light into the offices, while VRF air conditioning provides efficient heating and cooling. A considered specification supports comfort, energy efficiency and wellbeing.

LEED GoldTarget certification
A BERTarget energy rating
LEED Gold badge — target certification

Targeting LEED Gold certification

CGI of bright proposed office accommodation at Fabrica House
A WORKPLACE WITH PERSPECTIVE

Light-filled offices.
Space to do your best work.

Indicative office fit-out · CGI
05 / CONNECTED BY DESIGN

The right place.
For your next move.

Blanchardstown Corporate Park.
Dublin 15.

Positioned at Cruisrath Road and Corduff Road, Fabrica House offers a prominent setting within an established landscaped business park. Convenient access to the M2, M3 and M50 connects your business with Dublin and the wider national road network.

Explore the location ↗
Photomontage of Fabrica House on its prominent corner site at Cruisrath Road and Corduff RoadFabrica House / Blanchardstown Corporate Park · Photomontage
M2 · M3 · M50

Access to key road connections

Approx. 15 minutes

To Dublin Airport by car*

Approx. 15 minutes

To Dublin Port Tunnel by car*

*Indicative journey times from the brochure; subject to route and traffic conditions.

07 / YOUR NEXT CHAPTER

Make Fabrica House
your business address.

Ready for occupation Q2 2027.

Contact the joint agents to discuss your requirements.

PSRA Licence No. 001528

Philip Harvey

Managing Director

+353 87 839 3992pharvey@harvey.ie ↗

Hugh Herity

Associate Director

+353 87 720 5674hherity@harvey.ie ↗

PSRA Licence No. 002027

A DEVELOPMENT BYChannor Real Estate Group

Delivering high-quality property developments since 1990. From inception to long-term management, Channor creates enduring places built to perform.

Download brochure ↓
Property particulars & disclaimer

These particulars are for guidance only and do not constitute an offer or contract. Areas, dimensions, specifications, plans, images and completion dates are indicative and may change. Computer generated images and fit-outs are illustrative. LEED Gold and A BER are targets, not confirmed certifications. Prospective occupiers should verify all information independently and refer to the brochure for the full agents’ disclaimer.

Enlarged view of Fabrica House